Oracle Flow Manufacturing
Oracle Flow Manufacturing is a comprehensive manufacturing software solution that supports demand driven flow and lean manufacturing techniques designed to reduce product cycle times, minimize inventories, simplify production, and improve product quality. These techniques provide manufacturing operations with the ability to quickly respond to changing customer needs in an E-Business environment. Oracle Flow Manufacturing is part of the Oracle E-Business Suite, an integrated set of applications that are engineered to work together.
This chapter describes the following test flows in Oracle Flow Manufacturing:
- Define Setup for Flow Routing
- Flow Schedule Completion in Workstation
None.
Not applicable.
Table 29-1 Predefined Data for Oracle Flow Manufacturing
OA Page Name | Field Name | Field Value |
---|---|---|
User | User name /password | MFG/welcome |
Responsibility | Responsibility Name | Manufacturing and Distribution Manager |
Table 29-2 Setup Data for Oracle Flow Manufacturing
OA Page Name | Field Name | Field Value | Comments |
---|---|---|---|
Organization | Organization Name | V1 | V1 master organization |
Organization Name | S1 | S1 child organization |
29.1 Define Setup for Flow Routing
Defines new flow line, standard line operations, standard processes and flow events. Creates new flow assembly and defines the flow routing.Prerequisites
None.
Profile Options
Not applicable.
Predefined Data
Not applicable.
Setup Data
29.2 Flow Schedule Completion in Workstation
Creates flow schedule for lot and serial controlled assembly in line schedule workbench, opens and updates workstation parameters Schedule Selection Mode in HTML flow workstation. Performs flow schedule and completes with back flush items.Prerequisites
- Finished assembly is lot and serial controlled.
- BOM, flow routing.
- All dependent components have on-hand inventory.
- Flow routing for the assembly with three standard operations or events and processes.
- Network routing for the assembly and line is defined in graphical line work designer.
- Flow schedule defined for the line and assembly combination on the given date.
Not applicable.
Predefined Data
Table 29-4 Predefined Data for Flow Schedule Completion in Workstation Flow
Window Name | Field Name | Field Value |
---|---|---|
Line Scheduling Work bench | Scheduling Rule | NEW RULE |
WIP Parameters | Class | Flow |
Define Schedule Rules | Leveling | Mixed Model |
Table 29-5 Setup Data for Flow Schedule Completion in Workstation Flow
Window Name | Field Name | Field Value | Comments |
---|---|---|---|
Line Scheduling Work bench | Assembly | CHA_FLM_LSR_ASSY | |
Bill of Material | Components | CHA_LOT_SR_CMP1 | Lot and serial controlled component with supply type Operation Pull |
Components | CHA_SR1 | Serial controlled component with supply type Operation Pull | |
Components | CHA_CMP1 | Plain component with supply type Assembly Pull | |
Flow Routing | Standard Operation | op10 | Attach standard operations to the event |
Standard Operation | Op20 | Attach standard operations to the event | |
Standard Operation | Op30 | Attach standard operations to the event | |
Standard Events | e1 | Attach standard events to the resource | |
Standard Events | e2 | Attach standard events to the resource | |
Standard Events | e3 | Attach standard events to the resource | |
Standard Processes | pr10 | Attach standard processes to the events | |
Standard Processes | Pr20 | Attach standard processes to the events | |
Standard Processes | Pr30 | Attach standard processes to the events |