Oracle Engineering
Oracle Engineering enables you to control new item revisions and bill of material changes. Its prototype also enables you to move toward concurrent engineering by integrating engineering prototype data with manufacturing data.
This chapter describes the following test flows in Oracle Engineering:
- Create, Copy ENG to MFG, Propagate and Implement Engineering Change Order.
- Create Engineering Change Order (ECO) and Implement.
None.
Not applicable.
Table 27-1 Predefined Data for Oracle Engineering
Window Name | Field Name | Field Value |
---|---|---|
Responsibility | Responsibility Name | Manufacturing and Distribution Manager |
Organization | Organization | V1, M1 |
Engineering Bills Of Material | Display | Future and Current |
Action | Add | |
Action | Disable | |
Component Changes | Action | Add |
Engineering Bills Of Material | Supply Type | Push |
Table 27-2 Setup Data for Oracle Engineering
Window Name | Field Name | Field Value |
---|---|---|
User | User Name / Password | Plmmgr / welcome |
Item Template | Template | Finished Goods |
27.1 Create, Copy ENG to MFG, Propagate and Implement Engineering Change Order
Creates an engineering BOM; transfers item bill from engineering to manufacturing, propagates engineering change order to child organization and implements engineering change order in child organization.Prerequisites
None.
Profile Options
Table 27-3 Profile Options for Create, Copy ENG to MFG, Propagate and Implement Engineering Change Order Flow
Profile Name | Profile Value | Level |
---|---|---|
Enable Security Group | No | Site |
Table 27-4 Predefined Data for Create, Copy ENG to MFG, Propagate and Implement Engineering Change Order Flow
Page Name | Field Name | Field Value |
---|---|---|
Responsibility | Responsibility Name | Manufacturing and Distribution Manager |
27.2 Create Engineering Change Order and Implement
Defines engineering change order approval list, creates engineering change order, transfers and copies engineering items and bills to manufacturing, implements engineering change order and generates engineering change order detail report.Prerequisites
None.
Profile Options
Not applicable.
Predefined Data
Table 27-6 Predefined Data for Create Engineering Change Order and Implement Flow
Window Name | Field Name | Field Value |
---|---|---|
Responsibility | Responsibility Name | Manufacturing and Distribution Manager |
Table 27-7 Setup Data for Create Engineering Change Order and Implement Flow
Window Name | Field Name | Field Value |
---|---|---|
User | User Name / Password | plmmgr / welcome |
Item Template | Template | Purchased Item |
Approval Lists | Lists | JEAL |
Employee | Name | Williams, Steve, Smith, Mr. Jonathan |
Master Item | Item | EBS_COMP_10 |
Item | EBS_COMP_11 | |
Item | EBS_COMP_12 | |
Item | EBS_COMP_11 |
No comments:
Post a Comment